Customization: | Available |
---|---|
After-sales Service: | 1year |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Outside Dimension (mm) | 7006*5356*3450(L*W*H) | Inside Dimension(mm) | 6900*4000*2650(L*W*H) |
Front Door(mm) | 3000*2600(W*H) | Service door (mm) | 1800*650(W*H) |
Total Power | 17KW | ||
Cabin system | Wall panel | 50mm EPS sandwich panel, steel sheet thickness: 0.6mm | |
Ceiling panel | Galvanized steel sheet. | ||
Basement | 300mm depth, middle with grids, side with checkered plates. | ||
Ramp | three pieces 2000*900mm ramps | ||
Glass | 4mm safety tempered glass | ||
Windows | Square glass windows. | ||
Air Make-up System | Air Inlet fan system | 1*7.5kw turbo fan, proof-explosion motor, Ex rated | |
Exhausted fan system | 1*7.5kw turbo fan, proof-explosion motor, Ex rated | ||
Air capacity | 25000m3/h | ||
Air Flowing speed | 0.3m/s in empty booth | ||
Air Control method | One manual damper for air inlet and exhausted system | ||
Air ducting | 8 meters air duct, one flop damper and one weather hood | ||
Purification System | Pre-filter | G3 grade, Pockets filter | |
Ceiling filter | EU5 / F5 | ||
Floor filter | green fiber glass filter / G3 grade | ||
Exhausted fan Filters | Pocket filter or M green fiber glass filter and active carbon | ||
Heating System | Heat Exchanger | SUS304 material, argon arc welding. | |
Heating burner: | RG5S diesel oil burner(gas burner for option) | ||
Heating productivity | 260000Kcal/h | ||
Spray to baking switch | Pneumatic Damper | ||
Chimney ducting | 3 meters stainless ducting and one chimney elbow | ||
Max heating temperature | 80degrees | ||
Heating time | 5-6min(20-60degrees) | ||
fuel consumption | 6-8L/vehicle | ||
Lighting System | Ceiling lights | 8 Units, each 4 * 36W lamps, Total 1152 W | |
Side lights | 8 Units, each 4 *20W lamps, Total 800 W | ||
Illumination | 1000LUX | ||
Controlling system | Switched control panel | Spraying & baking switch, lighting switch, emergency stop, breakdown alarm, failure alarm, pressure gauge |
♦ Using High Quality Materials
♦ Stuidy and Durable Basement
♦ Safe and Simple Operation
Q: What standards are you carrying out for your products?